Reserve Advisors is the firm engaged to complete the Prestonfield HOA’s reserve study in 2026 — the first reserve study since Waldman Engineering Consultants in 2014 (a 12-year gap). The study identifies reserve components, projects replacement timelines and costs, and recommends a funding plan. Reserve Advisors was selected at the January 2026 board meeting at a contract price of $2,200. The study was reissued in revised form on September 25, 2026 after fence and retaining walls the HOA does not own were removed; see reserve-study-2026-revised.

Contract

ItemDetail
EngagementLevel II Reserve Study Update with Site Visit
Contract amount$2,200
Proposal dateNovember 13, 2025 (Ref. #131645)
ApprovedJanuary 14, 2026
Inspection / first versionFebruary 17, 2026
Revised study issuedSeptember 25, 2026 (Ref. #131645)
Report authorsTimothy J. Matthiesen, RS (inspection and report); Alan M. Ebert, PE, PRA, RS (quality assurance review)
Delivered study typeFull Reserve Study (Level I); contracted as a Level II update with site visit
Recommended updateTwo to three years after the study (cover letter); every three years (Section 4.7)
Payment$1,100 retainer paid Q1 2026 (confirmed in financial-report-2026-03)
Competing proposalBuilding Reserves (Level I Full New Study, $2,395) — not selected

Contact Information

FieldDetail
Account ManagerHenry McKenna
Phone(312) 604-5205
Emailhenry.mckenna@reserveadvisors.com
MailingPO Box 88955, Milwaukee, WI 53288-8926
Headquarters17335 Golf Parkway, Suite 150, Brookfield, WI 53045

Source: board-packet-2026-01-15 (Reserve Advisors proposal, dated 11/13/2025)

reserve-study-findings, reserve-study-2026-revised, assessment-structure, hoa-annual-finances

Meeting History

DateEvent
2025-11-13Reserve Advisors submitted Level II Reserve Study Update with Site Visit proposal to Prestonfield HOA ($2,200; Ref. #131645). Competing proposal from Building Reserves (Level I Full New Study, $2,395). Third proposal from Waldman Engineering was still pending at time of management report. Reserve Advisors proposal lists 215 homes (perpetuates 215 vs. 217 discrepancy). Source: board-packet-2026-01-15
2026-01-14Reserve Advisors selected from candidates; $2,200 contract approved. Source: minutes-2026-01-14
2026-02-17Full reserve study completed. 6 components identified; $1,288,158 total 30-year expenditures projected; phased funding increases recommended from $7,799/yr to ~$24,300/yr by 2031. Source: reserve-study-2026
2026-05-07Board reviewed study and questioned whether scope correctly excluded homeowner-owned property. Board to clarify with Reserve Advisors. Study’s actual classification appears correct — “Homes and Lots” designated Owner Responsibility. Source: minutes-2026-05-07
2026-07-16API (Marjorie) asked to have Reserve Advisors review and correct their figures if the Menards-road retaining walls were wrongly attributed to the HOA. Source: minutes-2026-07-16
2026-09-25Revised Full Reserve Study issued. Non-HOA fence and retaining walls removed; 5 components; 30-year total $492,918; recommended 2027 contribution $2,000. Source: reserve-study-2026-revised
2026-10-01Revised study (September 25 version) included in the October 1, 2026 board packet (pp.18–48) and listed on the agenda as “Reserve Study Revisions — Discussion/Approve.” Manager’s report: Reserve Advisors “revised the 2026 reserve study to remove all retaining walls which reduces the reserve contribution significantly.” Source: board-packet-2026-10-01